ART MUSEUM & LIBRARY IN OTA

(Project 2)

Killing Perspective.jpg

To kickstart the main project, a basic research and all the informations should be conducted to support design concept, building programme, and design strategies. This portion will be continuously developed and eventually applied and tested in final proposal. 

To support design strategies, you will present them with precedent studies that are carefully selected to strengthen your eventual proposal. For this proposal, you are required to choose a number of precedent studies and which element to focus on based on the 4 following themes mentioned above besides building structure and sustainable design approach. It is expected that relevant information such as drawings (General Arrangement + Details), images and details are included in as many details as possible.

REQUIREMENTS

Size: Total built up area approximately 2500sqm, with three (3) storeys building

Who: 200-250 persons

What: Should be analysed based on the elements of urban fabric, community, response to nature and aspirational themes of the buildings

SITE LOCATION