To kickstart the main project, precedent study should carried out by conducting basic research and combining all the information to support the design concept, building programme and design strategies. This portion will be continuously developed and eventually applied and tested in final proposal as these knowledge gathered can shed light on day to day design reference and development.

REQUIREMENTS

Size: Total built up area approximately 2500sqm, with three (3) storeys building

Who: 200-250 persons

What: Should be analysed based on the elements of urban fabric, community, response to nature and aspirational themes of the buildings

SITE LOCATION